Flood management measures
-
Adjustment of waterway
-
Afforestation
-
Amphibious building
-
Aquifer recharge
-
Breakwater
-
Budget diversion
-
Building elevation
-
Building relocation
-
Buildings as flood defence
-
Building without a crawlspace
-
Bypass channel
-
Canal and rill
-
Cascading flood compartment system
-
Coastal setback
-
Community involvement
-
Creation of a second dike line
-
Data collection
-
Deculverting of watercourses
-
Demountable flood protection barrier
-
Dike
-
Dike inspection and/or recovery
-
Dike reinforcement
-
Dike relocation
-
Ditch
-
Dredging of watercourse
-
Elaboration of municipal archives on major hazards
-
Emergency operation centre and personnel
-
Emergency supplies and utilities
-
EU Flood Risk Management Directive
-
Evacuation plan
-
Evacuation routes at elevated level
-
Family emergency planning
-
Fascine
-
Filled container
-
Filter drain
-
Filter strip
-
Filter trench
-
Flexible water level management
-
Floating agricultural system
-
Floating building
-
Flood control dam
-
Flood detention reservoir
-
Flood emergency framework
-
Flood forecasting and early warning
-
Flood gate
-
Flood hazard mapping
-
Flood insurance
-
Floodplain excavation
-
Flood proof infrastructure
-
Flood shelter
-
Frame barrier
-
Freestanding barrier
-
Government debt instrument
-
Green wall
-
High water mark
-
Hydraulic filling
-
Hydrological and Meteorological Observatory
-
Improved construction site preparation
-
Increased capacity of sewer/drainage system
-
Increase of infiltration capacity
-
Independent commission for flood and disaster risk reduction
-
International loan
-
Living with water - principles
-
Managed realignment
-
Monitoring and flood forecasting through partnerships
-
Multi-functional flood defences
-
Multi-layer safety as a central concept for flood protection
-
Multi-level capacity building
-
Network of waterways
-
Polder
-
Pond
-
Port restructuring
-
Prescription on the construction code
-
Public awareness, information, education and communication
-
Pumping station
-
Rainwater harvesting system
-
Red alert exercise
-
Rescue plan
-
Reserve funds
-
Revetment
-
River Training
-
Safety margins in new investment
-
Sandbag wall
-
Sectional barrier
-
Sediment replenishment
-
Seepage barrier
-
Sluice
-
Social network mapping
-
Stilt house building
-
Stormwater harvesting system
-
Sunken lane
-
Swale
-
Tax relief
-
Toroba
-
Vulnerability assessment
-
Weir
-
Wet-floodproofing technology
-
Wetland and wetland restoration