Case study: Redesign of flood protection system, Hamburg (21st c.)

Description of the application

Initialization of new construction program for flood protection. As a consequence of the storm surge of 1976 the complete flood protection line is to be increased by about a meter.

Implementation cost

Estimated financial cost for the implementation of the measures, given as a cost range.