Case study: Dike reinforcement, Land Hadeln, Lower Saxony, (20th c.)

Description of the application

Increase of the dike height. Due to the storm surge of 1976 a higher design water level was determined. The dikes need to be raised.

Implementation cost

Estimated financial cost for the implementation of the measures, given as a cost range.

Flood management measure

Which flood management measures have been applied? Multiple measures may be specified.

Country

Country in which the application (case study) is located. In case of a transboundary application multiple countries are specified.

Responsible authority level

Level of Responsible Authority.

Last modified: Sept. 12, 2016, 9:43 a.m.