Description of the application
Increase of the dike height. Due to the storm surge of 1976 a higher design water level was determined. The dikes need to be raised.Implementation cost
Estimated financial cost for the implementation of the measures, given as a cost range.
Flood management measure
Which flood management measures have been applied? Multiple measures may be specified.
Country
Country in which the application (case study) is located. In case of a transboundary application multiple countries are specified.
Sources
Last modified: Sept. 12, 2016, 9:43 a.m.