Case study: Hydraulic fillings: Hollerwettern-Scheelenkuhlen, Vorland Glückstadt, Fährmannssand, Hanskalbsand until Neßsand, Hetlinger Schanze, Bützflether Sand, Schwarztonnensand, Pagensand and Giesensand (20th c.)

Description of the application

Hydraulic filling as consequence of the depeening of the Elbe and ist fairway. The excavated sediment if deposited on the area of the islands.

Implementation cost

Estimated financial cost for the implementation of the measures, given as a cost range.

Flood management measure

Which flood management measures have been applied? Multiple measures may be specified.

Country

Country in which the application (case study) is located. In case of a transboundary application multiple countries are specified.

Responsible authority level

Level of Responsible Authority.

Last modified: Feb. 29, 2016, 7:40 p.m.