Case study: Construction of storm surge/flood barrier, Lühe, Lower Saxony (20th c.)

Description of the application

This flood barier replaced the precursor which was further downstream.

Implementation cost

Estimated financial cost for the implementation of the measures, given as a cost range.

Flood management measure

Which flood management measures have been applied? Multiple measures may be specified.

Country

Country in which the application (case study) is located. In case of a transboundary application multiple countries are specified.

Responsible authority level

Level of Responsible Authority.

Last modified: Sept. 12, 2016, 7:39 a.m.