Case study: Construction of Trischendamms, Friedrichskoog, Schleswig- Holstein, (20th c.)

Description of the application

The Trischendamm is part of the protection infrastructure of Friedrichskoog.

Implementation cost

Estimated financial cost for the implementation of the measures, given as a cost range.

Flood management measure

Which flood management measures have been applied? Multiple measures may be specified.

Country

Country in which the application (case study) is located. In case of a transboundary application multiple countries are specified.

Responsible authority level

Level of Responsible Authority.

Last modified: Sept. 12, 2016, 8:06 a.m.