Case study: Fairway adjustment, Elbe river, Schleswig- Holstein, Lower Saxony(20th c.)

Description of the application

Fairway adjustment of the tidal Elbe to 14.5m under MTnw with time. Deepening of the Elbe as consequence of the rising port operations.

Implementation cost

Estimated financial cost for the implementation of the measures, given as a cost range.

Flood management measure

Which flood management measures have been applied? Multiple measures may be specified.

Country

Country in which the application (case study) is located. In case of a transboundary application multiple countries are specified.

Responsible authority level

Level of Responsible Authority.

Last modified: Sept. 12, 2016, 8:54 a.m.