Description of the application
Berlin has partially achieved an extensive stormwater storage programme in its downtown area, already disposing in 2010 of a storage capacity of 213,000m3. By 2020, thanks to the optimisation of existing pipe networks, the retrofitting of CSOs and the creation of new underground storage facilities, 302,000m3 of stormwater will be storable. The entire project’s cost is estimated € 140 M.Comments
aim.prepared-fp7.eu/viewer/doc.aspx?id=73Implementation cost
Estimated financial cost for the implementation of the measures, given as a cost range.
Flood management measure
Which flood management measures have been applied? Multiple measures may be specified.
Project
Projects from which information has been harvested. Multiple projects may be specified.
Country
Country in which the application (case study) is located. In case of a transboundary application multiple countries are specified.
Last modified: Sept. 12, 2016, 7:12 a.m.