Description of the application
The proposed works are defined by the establishment of a structure to protect against erosion stock sandy and beach nourishment. The arrangement will allow the maintenance of sand facing the classic stirring conditions and protect urban areas against the sea during exceptional events called up a storm "Xynthia Sup". The successful development scenario is as follows: • Establishment of a breakwater cob 200 m long with a width of 15 meters to the ground and berm width of 5 m • Resurfacing 60 000 m3 of sand spread over a drop zone of about 55 000 m²Implementation cost
Estimated financial cost for the implementation of the measures, given as a cost range.
Flood management measure
Which flood management measures have been applied? Multiple measures may be specified.
Country
Country in which the application (case study) is located. In case of a transboundary application multiple countries are specified.
Last modified: Sept. 12, 2016, 10:12 a.m.