Description of the application
This action is to implement maintenance procedures for works of drainage system of rainwater to soak maintain maximum capacity in the event of overflows related to the seas. Siltation looks, drains and pipes lying in close to the beach and especially the marine boulevard was found.Implementation cost
Estimated financial cost for the implementation of the measures, given as a cost range.
Flood management measure
Which flood management measures have been applied? Multiple measures may be specified.
Country
Country in which the application (case study) is located. In case of a transboundary application multiple countries are specified.
Last modified: Sept. 13, 2016, 3:14 a.m.